• Planning Permit Approval — 27th September 2018
• Endorsed Plans — 6th April 2020
• Specifications — 8th October 2019
Slideshow — Site Preparation & Construction Work
Click the left and right white arrows to move manually through the show.
View a photo gallery of Shed Extension work to date.
Shed Extension Plan Shed Site Tree Removal (7 Nov ’18) Tree Removal (7 Nov ’18) Site cleared Left: Ian Howley, John Driver & Craig Seymour Road fill spreading (3 Jun ’19) Road fill spreading Road fill spreading KV Bobcat Corey Jones (Plumber) realigning sewerage pipes Craig Seymour (KV Bobcat) & Ian Howley Left: Brian Keeble & Ian Howley (28 May ’19) Stormwater pipe trench Dick Puttyfoot Ian Howley in the trench Ian Howley Safety fence around site Ian Howley – initial compaction Serious Work – the Big Roller (27 Mar’20) Foundation work complete Builder on-site – July ’20 Builder on-site – July ’20 Reo being laid Pouring the foundation slab Levelling the slab Construction continues – August ’20 Main framework in place Inside view looking west Inside view looking east Barry Hinson on the blower prior to sealing the floor From left: Ian Howley & Henry Ziemnicki sealing the floor Phil Armitage our stormwater drain guru-nice design work Timber delivery from Bunnings. From left: Ian Howley & Henry Ziemnicki From left: Jeremy Reichl (master builder) & Ian Howley planning… Internal framing – From left: Jeremy Reichl, Phil Armitage & Duncan Robertson Pallet of plywood pick-Myrtelford. Ian Howley The break through! Main Shed to Extension past the toilets. From left: Noel McDougall, Henry Ziemnicki & Dick Puttyfoot Insulation installing. Ian Howley Stairs to the storage mezzanine – A masterly job by Jeremy Reichl Sound insulation delivery. From left: Henry Ziemnicki, Ian Howley & Noel McDougall East wall framing-11th Feb 2021. From left: Phil Armitage, Dick Puttyfoot & Jeremy Reichl
Shed Extension work so far — November 2018 to March 2021